top-ban
News Center
  1. Home >
  2. Doko Gold Cip Plant Sa Guinee

Doko Gold Cip Plant Sa Guinee

In 2009 the CIP plant increased volumes to 10.4Mt. A total of 74939m was drilled at the Siguiri mine and 8.8Mt of gold was mined during 2019. The CIP was converted into a hybrid carbon-in-leach CIL circuit processing plant in 2018. The original processing plant was capable of processing soft ore alone.

Get Price
Contact Us

Are You Looking for A Consultant?